于家堡二标段装饰工程自检报告

于家堡二标段装饰工程自检报告

ID:13843226

大小:27.35 KB

页数:9页

时间:2018-07-24

于家堡二标段装饰工程自检报告_第1页
于家堡二标段装饰工程自检报告_第2页
于家堡二标段装饰工程自检报告_第3页
于家堡二标段装饰工程自检报告_第4页
于家堡二标段装饰工程自检报告_第5页
资源描述:

《于家堡二标段装饰工程自检报告》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、于家堡金融区起步区03-25地块室内装饰装修工程(二标段)装饰工程质量自检报告编制人:郭强福建永盛设计装饰工程有限公司2016年3月16日connection,tighteningtorquevaluebythecorrespondingvalueusingsmallerdiameterrebar.3,reinforcedjointstestedprocess:beforetheofficialconstruction,accordingtothesamebar,samemechanicaljointjointjointspeci

2、mensintheformofnotlessthan3,andinterceptionofjointspecimenmaterial,tensilestrengthtestsarecarriedout.Siteinspection:inspectionlotsunderthesameconditionsusingthesamematerials,forms,withthespecificationsoftheconnectorsforevery500foracceptanceofabatch,byacceptanceofabatc

3、hoflessthan500connectors,electricarcweldingofsteelbarsaftersampling.Eachacceptanceofaconnectormustbeinengineeringstructureofrandominterceptionof3specimentensilestrengthtests,when3jointtensilestrengthofspecimensinaccordancewiththerelevantprovisionsofstrength,thistestma

4、ybefoundqualified.(E)reinforcementoftheengineeringsteelbarstransversereinforcementand≤12colligation,longitudinalreinforcement,designtype,size,spacingandquantityaccordingtothedrawingforconstruction.PositioningtheladderbarswithadiameterlargerthantheStud.Paintedsteelposi

5、tion,notethestartbar50mm.Bindingthreadiseight-shaped,screwed.(1)thefloorreinforcementslabreinforcementorder:elasticsteellinepad→→→laythebottomlayerofthereinforcingsteeltiebeamreinforcementlayingprofessionalutility→→→horseplacedreinforcementbenchmarkingtopmatlayingspac

6、ing→→secondaryupperreinforcementwirelocate第9页共9页于家堡金融区起步区03-25地块室内装饰装修工程(二标段)目录一、工程概况二、评估依据三、质量控制资料核查情况四、安全和功能检验资料核查及主要功能抽查情况五、观感质量检查情况六、分部、分项工程的划分及施工质量情况七、工程质量验收情况八、评估结论connection,tighteningtorquevaluebythecorrespondingvalueusingsmallerdiameterrebar.3,reinforcedjoint

7、stestedprocess:beforetheofficialconstruction,accordingtothesamebar,samemechanicaljointjointjointspecimensintheformofnotlessthan3,andinterceptionofjointspecimenmaterial,tensilestrengthtestsarecarriedout.Siteinspection:inspectionlotsunderthesameconditionsusingthesamemat

8、erials,forms,withthespecificationsoftheconnectorsforevery500foracceptanceofabatch,byacceptanceofabatchoflessthan500connector

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。