主体分部工程验收评估报告制式化

主体分部工程验收评估报告制式化

ID:14707715

大小:114.00 KB

页数:13页

时间:2018-07-30

主体分部工程验收评估报告制式化_第1页
主体分部工程验收评估报告制式化_第2页
主体分部工程验收评估报告制式化_第3页
主体分部工程验收评估报告制式化_第4页
主体分部工程验收评估报告制式化_第5页
资源描述:

《主体分部工程验收评估报告制式化》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、项目名称#楼主体分部工程验收评估报告编制人:审核:审批:监理单位:编制日期:20年月日(公司章)connection,tighteningtorquevaluebythecorrespondingvalueusingsmallerdiameterrebar.3,reinforcedjointstestedprocess:beforetheofficialconstruction,accordingtothesamebar,samemechanicaljointjointjointspecimensintheformofn

2、otlessthan3,andinterceptionofjointspecimenmaterial,tensilestrengthtestsarecarriedout.Siteinspection:inspectionlotsunderthesameconditionsusingthesamematerials,forms,withthespecificationsoftheconnectorsforevery500foracceptanceofabatch,byacceptanceofabatchoflessthan

3、500connectors,electricarcweldingofsteelbarsaftersampling.Eachacceptanceofaconnectormustbeinengineeringstructureofrandominterceptionof3specimentensilestrengthtests,when3jointtensilestrengthofspecimensinaccordancewiththerelevantprovisionsofstrength,thistestmaybefou

4、ndqualified.(E)reinforcementoftheengineeringsteelbarstransversereinforcementand≤12colligation,longitudinalreinforcement,designtype,size,spacingandquantityaccordingtothedrawingforconstruction.PositioningtheladderbarswithadiameterlargerthantheStud.Paintedsteelposit

5、ion,notethestartbar50mm.Bindingthreadiseight-shaped,screwed.(1)thefloorreinforcementslabreinforcementorder:elasticsteellinepad→→→laythebottomlayerofthereinforcingsteeltiebeamreinforcementlayingprofessionalutility→→→horseplacedreinforcementbenchmarkingtopmatlaying

6、spacing→→secondaryupperreinforcementwirelocate目录一、前言3二、工程概况3三、监理质量评估依据5四、施工原材料、半成品材料质量控制5五、施工过程中的控制8六、质量评定情况10(一)地基与基础分部工程质量评定10(二)工程主体结构分部工程施工质量评价10七、安全文明施工12八、工程技术资料整编情况12九、工程质量评估结论13connection,tighteningtorquevaluebythecorrespondingvalueusingsmallerdiameterreb

7、ar.3,reinforcedjointstestedprocess:beforetheofficialconstruction,accordingtothesamebar,samemechanicaljointjointjointspecimensintheformofnotlessthan3,andinterceptionofjointspecimenmaterial,tensilestrengthtestsarecarriedout.Siteinspection:inspectionlotsunderthesame

8、conditionsusingthesamematerials,forms,withthespecificationsoftheconnectorsforevery500foracceptanceofabatch,byacceptanceofabatchoflessthan500connectors,electric

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。