中广核地下室工程监理实施细则

中广核地下室工程监理实施细则

ID:19544470

大小:339.00 KB

页数:27页

时间:2018-10-03

中广核地下室工程监理实施细则_第1页
中广核地下室工程监理实施细则_第2页
中广核地下室工程监理实施细则_第3页
中广核地下室工程监理实施细则_第4页
中广核地下室工程监理实施细则_第5页
资源描述:

《中广核地下室工程监理实施细则》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、上海中广核技术产业研发中心工程监理实施细则(地下室土建工程)专业监理工程师:总监理工程师:上海申海建设监理有限公司中广核技术产业研发中心项目监理部2010年7月-27-目 录一、编制依据················································································································3二、基本要求1. 监理范围··························································

2、··························································32. 开工前的准备工作 ···································································································3三、施工过程监理··································································································

3、····· 4四、静压桩施工质量监理1. 施工质量要求 ···········································································································62. 静压桩施工质量控制2.1 施工准备的质量控制······························································································92.2 施工过程的质量控制········

4、······················································································9五、 土方工程质量监理·······························································································10六、地下室防水工程质量监理·····································································

5、··············12七、后浇带施工质量监理···························································································16八、模板工程施工质量监理·······················································································19九、钢筋工程质量监理··············································

6、·················································20-27-一、工程概况1.项目名称:上海中广核技术产业研发中心2.子项目名称:包括地下室、产业中心、研发中心、图文中心、行政中心、会议中心、服务中心、门卫8个子项目3.参建单位:建设单位:上海中广核工程科技有限公司设计单位:同济大学建筑设计研究院(集团)有限公司;监理单位:上海申海建设监理有限公司施工单位:广厦建设集团有限责任公司4.工程地址:上海市闵行区紫竹科学园区东川路南、淡水河东、紫星路北,吴泾镇工—52号地块5.建筑面积:总建筑面积10983

7、2m2,其中地下室建筑面积32112m26.建筑层数:地下一层、地上4及5层,建筑最高度24m7.抗震设防烈度:7度8.人防区域:①~⑧/~轴内设置平战结合的甲类、核六级人防地下室,建筑面积2000m2,地下室顶板室外部分覆土厚度450mm9.地下室防水:抗渗等级为P6、二级,其中变电所区域为一级10.结构性质:设计使用年限50年,安全等级二级11.施工后浇带:设置数道后浇带,从基础底板至屋面且对应位置二、编制依据1.本工程已审批《监理规划》2.《设计图纸》-27-3.《建设工程监理规范》GB50319-20004.《建筑工程施工质量验收统一标准》

8、GB50300-20015.《混凝土结构工程施工质量验收规范》GB50204—20026.《块体基础大体积混凝土施工技术规

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。