2019届高三英语上学期11月月考试题(无答案)

2019届高三英语上学期11月月考试题(无答案)

ID:45540102

大小:75.50 KB

页数:14页

时间:2019-11-14

2019届高三英语上学期11月月考试题(无答案)_第1页
2019届高三英语上学期11月月考试题(无答案)_第2页
2019届高三英语上学期11月月考试题(无答案)_第3页
2019届高三英语上学期11月月考试题(无答案)_第4页
2019届高三英语上学期11月月考试题(无答案)_第5页
资源描述:

《2019届高三英语上学期11月月考试题(无答案)》由会员上传分享,免费在线阅读,更多相关内容在教育资源-天天文库

1、2019届高三英语上学期11月月考试题(无答案)本试卷分第I卷(选择题)和第II卷(非选择题)两部分。满分100分,考试用时100分钟。注意事项:1.答题前,考生务必将自己的准考证号、姓名、班级、考号等信息填写在答题卡上。2.用2B铅笔把答题卡上对应题目的答案标号涂黑,如需要改动,用橡皮檫干净后,再涂选其他答案标号。3.请保持答题卡平整,不能折叠。考试结束,监考员将试题卷、答题卡一并收回。第一部分阅读理解(共两节,满分40分)第一节(共15小题:每小题2分,满30分)阅读下列短文,从每小题所给的四个选项(A、B、C和D)中选出最佳选项,并在答题卡上将其涂黑。AFa

2、mous Modern Chinese BuildingsBeijing International Airport    The first place most visitors see when they arrive in China is Beijing International Airport. The airport was constructed in the 1950s. It has an indoor garden, a children's playground, and over 70 food businesses in Termin

3、al 3 alone.Shanghai World Financial Center  pleted in xx, SWFC took over 10 years to plete due to financial shortages and construction delays. Since its pletion, it has won countless architectural awards.Tourists are wele at SWFC's viewing platform, which at 474 meters above ground is

4、 the world’s highest closed viewing platform.The Water Cube    It was constructed for use during the Beijing xx Summer Olympics. Now visitors can express surprise at the architecture of the building. They can enjoy the indoor atmosphere as well.  Among the offerings of the Water Cube 

5、are a restaurant and bar, a shopping area, and Water World, a family water park.The Bird's Nest,Beijing    It was designed mainly for the xx Summer Olympics. It can hold up to 80,000 people and has been used for a winter theme park. Nowadays, its main ine is as a tourist attraction. I

6、t draws more than 20,000 tourists every day.National Center for the Performing Arts    It was pleted in xx. The building is surrounded by a man-made lake, requiring guests to enter via an underground hallway. It is home to an Opera Hall, Music Hall, and Theater.1.Whichofthefollowingbu

7、ildingswasfirstconstructed?A.BeijingInternationalAirport.B.ShanghaiWorldFinancialCenter.C.TheWaterCube.D.TheBird'sNest,Beijing.2.WhywastheconstructionofShanghaiWorldFinancialCenterdelayed?A.Itneededmoreconstructionworkers.B.Itfacedtoomuchterribleweather.C.Itaddedanextraviewing-platfor

8、m.D.I

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。