输水管道安装及深井泵房工程.doc

输水管道安装及深井泵房工程.doc

ID:55738514

大小:801.00 KB

页数:61页

时间:2020-03-06

输水管道安装及深井泵房工程.doc_第1页
输水管道安装及深井泵房工程.doc_第2页
输水管道安装及深井泵房工程.doc_第3页
输水管道安装及深井泵房工程.doc_第4页
输水管道安装及深井泵房工程.doc_第5页
资源描述:

《输水管道安装及深井泵房工程.doc》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、沣西新城应急给水厂项目输水管道及深井泵房工程施工组织设计编制:审核:批准:日期:年月日54/61目录第一章编制依据编制依据···············································1第二章工程概况第一节工程简介···············································1第二节给水管道施工概况·······································1第三节深井泵房施工概况·······································2第

2、四节电气自控施工概况·······································2第三章项目经理部组成人员第一节项目经理部组织机构成人员······························3第二节项目经理部机构组织····································3第三节54/61项目经理部各级岗位职责································4第一节施工中平面布置图······································6第四章劳动力、材料、机械设备投

3、入计划第一节施工机械设备投入计划··································7第二节施工材料投入计划······································8第三节施工进度计划··········································9第四节劳动力安排计划········································10第五节安全防护用品计划······································10第六节检测仪器设备计划·······

4、·······························11第五章施工方案第一节54/61测量放线···············································11第二节土方工程···············································12第三节管道安装···············································15第四节管道过河段施工·········································16第五节管道接口·

5、··············································20第六节管道支墩···············································21第七节井室及深井泵房砌筑·····································22第八节管道水压试验···········································25第九节管道清洗、消毒·········································2654/61第十节管道防腐

6、···············································27第十一节管道回填··············································28第六章施工管理措施第一节质量保证措施··········································30第二节工期保证措施··········································31第三节安全保证措施··········································37第

7、四节文明施工措施··········································38第五节环境保护措施··········································46第七章与其它单位的配合措施第一节与业主、设计、监理等单位的配合措施····················51第二节与材料及设备供应商的配合措54/61施·························5154/61第一章编制依据1、《城镇给水排水技术规范》(GB50788-2012)2、《室外给水设计规范》(GB50013-2006

8、)3、《给水排水工程管道结构设计规范》(GB50332-2002)4、《给水排水工程构筑物结构设计规范》(GB50069-2002)5、《给水排水管道工程施工及验收

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。