辅机循环冷却水系统调试措施

辅机循环冷却水系统调试措施

ID:36765885

大小:311.84 KB

页数:17页

时间:2019-05-15

辅机循环冷却水系统调试措施_第1页
辅机循环冷却水系统调试措施_第2页
辅机循环冷却水系统调试措施_第3页
辅机循环冷却水系统调试措施_第4页
辅机循环冷却水系统调试措施_第5页
资源描述:

《辅机循环冷却水系统调试措施》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、内蒙古国华呼伦贝尔发电厂(2×600MW)机组工程调试技术方案(措施)报审表编号:IMEPSRI/05-J003单位工程名称内蒙古国华呼伦贝尔发电有限公司致:江西城达工程咨询监理有限公司国华呼伦贝尔项目监理部监理公司:我单位已根据调试合同的有关规定,完成了内蒙古国华呼伦贝尔发电有限公司一期工程(2×600MW)机组辅机循环冷却水系统调试技术方案(措施)的编制,并经我单位上级技术负责人审查批准,请予以审查。附件:内蒙古国华呼伦贝尔发电有限公司一期工程(2×600MW)机组辅机循环冷却水系统调试措施承包单位

2、(章):项目经理:年月日专业监理工程师:专业监理工程师:年月日总监理工程师:监理公司(章):总监理工程师:年月日工程部:工程部(章):专工:年月日负责人:年月日本表一式五份,由承包单位填写,建设单位、监理单位各存一份,承包单位存三份.内蒙古国华呼伦贝尔发电有限公司一期工程2×600MW机组辅机冷却循环水系统调试措施内蒙古电力科学研究院二○一○年三月内蒙古国华呼伦贝尔发电有限公司一期工程2×600MW机组调试措施措施编号:QJ-2010-002起讫时间:2010年4月—2010年5月措施日期:2010年4

3、月项目负责人:张锋工作人员:张锋高俊乐编写人员:张锋审核:焦晓峰刘永江批准:潘云珍2内蒙古国华呼伦贝尔发电有限公司一期工程2×600MW机组调试措施摘要本措施依据《火电工程启动调试工作规定》等规范及厂家技术资料和设计院图纸,为内蒙古国华呼伦贝尔发电有限公司一期2×600MW工程辅机循环冷却水系统调试拟定。内容涵盖了辅机循环冷却水系统的设备介绍,系统调试必须具备的条件、调试工作的主要内容、注意事项及组织分工,是辅机循环冷却水系统调试得以安全顺利完成的技术保障。关键词循环水;分系统;调试3内蒙古国华呼伦贝尔

4、发电有限公司一期工程2×600MW机组调试措施目录1系统概述································································································································(6)2设备规范························································································

5、········································(6)2.1机力通风塔···························································································································(6)2.2循环水泵······································································

6、·························································(8)2.3板式换热器···························································································································(8)2.4旋转滤水器····················································

7、·······································································(9)3调试目的································································································································(9)4编制依据·······································

8、·························································································(9)5调试应具备的条件········································································································(10)6调试内容········

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。