《水江至界石段高速公路施工设计毕业论文》由会员上传分享,免费在线阅读,更多相关内容在学术论文-天天文库。
1、水江至界石段高速公路施工设计毕业论文目录表1施工组织设计文字说明·············································105第一章工程概况················································1051.1工程位置、范围············································1051.2本工程建设条件··········································1051.3工程设计概况·················
2、······························1061.4工程特点、重点··········································107第二章总体施工规划·········································1082.1施工总目标···············································1081912.2组织机构设置·············································1082.3总体施工顺序········
3、·····································1102.4总体施工方案·············································1102.5施工准备··················································1112.6施工便道···················································1112.7施工营地的设置············································1112
4、.8砼拌合站和临时预制厂的设置·······························1112.9施工用电···················································1122.10施工用水················································1122.11施工通讯················································1132.12临时工程数量······································
5、······113第三章191施工进度安排及工期保证措施····························1143.1标段总工期安排···········································1143.2主要工程项目开、竣工日期··································1143.3龙凤山隧道施工进度安排····································1143.4总体施工进度计划网络图····································1153.5
6、龙凤山隧道施工进度计划图································1153.6工期保证措施·············································115第四章设备、人员动员周期和设备、人员、材料运到现场的方法·····1204.1劳动力管理计划及保证措施·································1204.2主要材料供应计划及保证措施································1224.3设备配置计划及保证措施····················
7、···············123第五章龙凤山隧道施工方案、施工方法··························1285.1龙凤山隧道施工方案·········································1285.2龙凤山隧道施工方法及措施··································1301915.2.1洞口施工·············································1305.2.2洞身开挖···································
8、···········1325.2.3初期支护及辅助施工措施·································1365.