轻型井点降水方案

轻型井点降水方案

ID:14935130

大小:230.50 KB

页数:11页

时间:2018-07-31

轻型井点降水方案_第1页
轻型井点降水方案_第2页
轻型井点降水方案_第3页
轻型井点降水方案_第4页
轻型井点降水方案_第5页
资源描述:

《轻型井点降水方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、轻型井点降水施工方案XX工程公司年月日目录一、工程概况···································································2二、编制依据····································································2三、降水方案选择·······························································2四、井点降水相关计算·············

2、············································3五、主要降水设备·······························································6六、施工工期·····································································7七、井点施工方法·······························································7

3、八、质量标准及质量保证措施················································8九、危险点分析································································10十、安全生产及文明施工措施···············································10十一、环保措施·····························································

4、···11工程概况本期设计为2×600MW亚临界汽轮发电机组。工程地质情况:本工程持力层采用③圆砾层做持力层,③圆砾,层顶一般埋深3.0m~4.5m,一般厚度6.5m~9.5m。④细中砂层,层顶埋深一般为10.0m~13.0m。一般厚度5.0m~7.0m。⑤圆砾层分布于④层之下。层顶一般埋深15.0m~18.0m。⑥粘土(残积土),褐色,稍湿,坚硬,覆于凝灰岩之上。最大厚度大于6.8m。一、编制依据《火电施工质量检验及评定标准》《电力建设施工及验收技术规范》《建筑施工计算手册》临时土方开挖图纸二、降水方案选择该项目地处伊敏河

5、畔,属砂砾地质结构,渗透系数为150m/天,容水量大,受降水影响地下水位波动变幅1-2m。枯水期在-6m左右。而本工程大部分建筑物埋深在-6m,处于临界状态,丰水期就无法施工,本工程采取的措施是:采用明沟、集水井的方式进行作业层表面水的降水。在枯水期柱、基础底脚施工完、回填完,防止丰水期淹没,以减少降水施工的降水费用。基础埋深超过-6m的,采用局部井点降水。本工程主厂房基础底标高为-5.0m,不须采用井点降水,而循环水泵坑及汽轮机基础底标高为-7.5m,可采用轻型井点降水。基础平面基底长度约为50m,宽度约为36m。基础埋深

6、为见施工图,地面持力层为圆砾层,井点降水可以避免大量涌水、冒泥、翻浆,而且在砂砾地层中开挖基坑时,可防止流砂现象发生,渗流向下改善土的性质,使基底土质更加密实,结合本工程基础施工主要在枯水期期间,周期较长的特点,采用轻型井点降水法,沿建筑物环状布置进行人工降水。同时基坑二角设集水箱配合4台QY-3.5型潜水泵排除明水的方法。三、井点降水相关计算1、井点管的埋设深度H≥H1+h+iL+l式中H——井点管的埋设深度(m)H1——井点埋设面至基坑底面距离(m)取3.0mh——基坑中央最深挖掘面至降水曲线点的安全距离(m)取1.0m

7、L——井点管中心至基坑中心的短边距离(m)取27i——降水曲线坡度取1/10l——滤管长度(m)取1.2H≥3.0+1.0+27×1/10+1.2=7.9m取8m2、涌水量计算(2H-S)SLgR-LgXOQ=1.366KQ——井点系统总涌水量(m3/d)K——渗透系数(m/d)取150H——含水层厚度(m)计算暂取11mR——抽水影响半径(m)计算取91S——水位降低值(m)取1.2,地下水位取6.8mXO——基坑设想半径(m)计算取24本工程以无压非完整井计算(2×11-1.2)×1.2Lg91-Lg24Q=1.366×

8、150=8818m3/d3、计算井点管数量和间距单井出水量q=65πdl×3K=65×3.14×0.05×1.2×3150=65m3/d需井点管数量:n=1.1Q/q=149根基坑四角处及机械入口处井点管应加密,则采用的井点管数量为149+32=181根井点管间距平均为D=2×86/(18

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。