TruckorRailcarLoadoutTruckor有轨车装车

TruckorRailcarLoadoutTruckor有轨车装车

ID:36714500

大小:177.68 KB

页数:5页

时间:2019-05-14

TruckorRailcarLoadoutTruckor有轨车装车_第1页
TruckorRailcarLoadoutTruckor有轨车装车_第2页
TruckorRailcarLoadoutTruckor有轨车装车_第3页
TruckorRailcarLoadoutTruckor有轨车装车_第4页
TruckorRailcarLoadoutTruckor有轨车装车_第5页
资源描述:

《TruckorRailcarLoadoutTruckor有轨车装车》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、TruckorRailcarLoadoutDependingontheparticularsituation,atransferofmaterialtoatruckorrailcarmaybemodeledasapointsourceoravolumesource(s).Ifasleeve,“spoutsock,”oraugersystemisusedtodeliverthematerialtoadelimitedareawithinthereceivingvolumeandtheentrainmentofmateri

2、alfromwindsacrossthereceivingvolumearenotsignificant,thenconsiderthisapointsourceforparticulateemissions.InaccordancewithDNR’sDispersionModelingGuidelines,theexitvelocityassociatedwiththepointsourceshouldbesetto0.001m/ssincethedischargeisdownwarddirected.Ifthede

3、liveryprocessand/orre-entrainmentarenotwell-controlled,considermodelingthesourceasavolumesource.DNRrecommendsusingthelength,width,andheightofthetrucktrailerorrailcartodetermineparameters.Thelength/widthratio(roundedtonearestinteger)determinesthenumberofvolumesou

4、rces.Theusualapproachwouldbetosetthereleaseheightat½thestructureheight,correspondingtothemiddleofthevolume.Thismaybeacceptableforinternalemissionsbeingreleasedfromabuilding;howeveramoreappropriateapproachforloadingoperationsmaybetoassumethe1releaseheightisatthet

5、opofthetrucktrailerorrailcar.Releaseheight=h=heightoftrucktrailerorrailcarTreatthesourceasanelevatedvolumesource(he>0=h)andasifitwereonoradjacenttoabuilding—thebuildingbeingthetrailerorrailcar.Therefore,σz=h/2.15Ifthelength-to-widthratioofthetrailerorrailcar(rou

6、ndedtothenearestinteger)is1,thentheinitiallateralplumespreadis:σy=w/4.3wherewistheside-to-sidewidthofthetrailerorrailcarIfthelength-to-widthratiois2orgreaterandthesourceisrepresentedbyseparatedvolumes(thisisusuallythewayitisrepresented),thenσy=d/2.15,wheredisthe

7、center-to-centerdistancebetweenthevolumesIfthelength-to-widthratiois2orgreaterandthesourceisrepresentedbyadjacent(continuous)volumes,then2σy=w/2.15.1Insomecases,loadoutoperationsmaytakeplacewithinabuilding.Itmaythenbeappropriatetotreattheentirebuildingasatypical

8、volumesourcewithabuildingenclosurecreditfactorapplied.2Theseproceduresareconsistentwiththedescriptionsofmodelingvolumesourcesfoundintheuser’smanualforAERMOD.Version3-

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。