某外墙涂料施工组织设计

某外墙涂料施工组织设计

ID:37133048

大小:6.26 MB

页数:78页

时间:2019-05-18

某外墙涂料施工组织设计_第1页
某外墙涂料施工组织设计_第2页
某外墙涂料施工组织设计_第3页
某外墙涂料施工组织设计_第4页
某外墙涂料施工组织设计_第5页
资源描述:

《某外墙涂料施工组织设计》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

1、.目录一、编制依据及工程概况·······························31、编制说明·········································32、编制依据·········································3二、工程概况及特点·········································3三、外墙弹性涂料········································31、材料准备··········································32

2、、作业条件······································43、施工方案及技术措施································44、质量要求··········································6..5、成品、半成品保护措施································76、工程质量控制及检测··································87、质量保证措施······································9四、热固型改性聚苯板外墙外保温

3、系统施工技术方案··················10五、施工总进度计划及保证措施·······························28六、涂料施工工艺、材料系统主要参数指标······················32七、安全文明目标及保证措施··································35八、高空作业安全防护措施····································39九、对处理扰民之措施方案····································40十、对防止扰民之措施方案·············

4、·······················41十一、确保工程质量的技术组织措施····························42十二、确保安全生产的技术组织措施····························46十三、保证工程顺利进行的经济措施、合同措施··················50十四、确保文明施工的技术组织措施····················50..十五、确保工程工期的保证措施····························52十六、与总包及其他承包人之间的配合协调措施(含监理)···············56十七、成品保护

5、措施··········································59十八、临时用电用水方案······································60十九、其它工程·········································601、安全保证措施·····························602、雨季条件下的施工措施······················60二十、工程质量保修、工期保证及劳务人员保证承诺··············61二十一、本工程的重点及难点··················

6、····63..一、编制说明及编制依据1、编制说明本工程位于楼全部为超高层建筑,临街配套底商,地下为地下车库,其中地上部分37~40层,地下建筑面积约万平方米;地上部分为万平方米,总建筑面积约23.68万平方米。2、编制依据1.1施工图图纸1.2《建筑施工手册》(第四版)1.3《建筑工程施工质量验收统一标准》GB50300-20011.4《建筑装饰装修工程质量验收规范》GB50210-20011.5《住宅建筑围护结构节能应用技术规程》DG/TJ08-206-2002二、工程概况及特点商住楼、相应商业裙房及地面出地面结构部分外墙保温系统(保温板做法部分,包括后砌墙部分外墙抹灰)的

7、采购、施工及饰面涂料的生产(或采购)、供应及施工(含底层找补腻子等全部工序)。..工期按照业主合同:里程碑节点进度要求,具体详见进度计划表。三、外墙弹性涂料1、材料准备外墙弹性涂料:按设计要求及样板颜色选用,所用材料应一次备齐。涂料应有出厂合格证、出厂日期及使用说明书。选用的材料应符合设计要求及国家、行业现行规范规定的标准。底材要求:总包基层抹灰已完成并保养了20天左右,基层的碱度PH值在9以下,同时基层已干燥(至少已干燥15天),湿度低于8%;基层表面平整,阴阳角及角线密实,轮廓分明;墙面

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。