简支变连续施工方案.pdf

简支变连续施工方案.pdf

ID:57144929

大小:2.61 MB

页数:44页

时间:2020-08-03

简支变连续施工方案.pdf_第1页
简支变连续施工方案.pdf_第2页
简支变连续施工方案.pdf_第3页
简支变连续施工方案.pdf_第4页
简支变连续施工方案.pdf_第5页
资源描述:

《简支变连续施工方案.pdf》由会员上传分享,免费在线阅读,更多相关内容在工程资料-天天文库

1、目录一、编制依据·········································································2二、编制原则·········································································2三、工程概况·········································································3四、施工组织计划···············································

2、····················3五、工艺原理·········································································5六、施工工艺·········································································5七、质量保证体系和措施·························································21八、安全保证体系和措施···································

3、······················26九、文明施工、环境保护措施···················································31十、节能减排········································································33简支变连续体系转换施工方案一、编制依据本方案除根据施工现场实际情况外,依据下列文件、规范、规程进行编制:1、滨海新区西外环高速公路工程Ⅲ标合同文件2、滨海新区西外环高速公路工程Ⅲ标施工图纸3、滨海新区西外环高速公路工程Ⅲ标施工图设计说明4、滨海新区西外环

4、高速公路工程标准化施工指南5、《公路工程质量检验评定标准》80/1-20046、《建筑机械使用安全技术规程》33-20017、《施工现场临时用电安全技术规范》46-20058、《公路桥涵施工技术规范》50-20119、《补偿收缩混凝土应用技术规程》178-200910、《施工现场安全生产体系》08-903-200311、《建筑施工安全检查标准》59-99二、编制原则总的原则是施工方案符合现场实际施工需要,确保工程安全、优质、按时完成。1、服从业主、遵守设计、尊重监理的原则。2、确保工期的原则。3、质量第一的原则。4、安全第一、预防为主的原则。5、科学管理的原则。6、文明施工的原则。7、遵

5、照设计、遵守标准、规范的原则。三、工程概况1、本标段(既西外环高速公路工程标段)起点桩号为K4+491.951,终点桩号为K8+900.00,全长4408.049m,含黄港水库南分离式立交一座,上部结构均采用预应力简支变连续小箱梁,每跨为10片预制小箱梁,跨径布置为4×30+3×30+4×30+3×30+4×30(m),共5联180片。主要工程数量见下表:表1小箱梁主要工程数量表类型数量重量()类型数量重量()中跨中梁48850中跨边梁32926边跨中梁12878边跨边梁8948(80缝)(80缝)边跨中梁48873边跨边梁32943(160缝)(160缝)四、施工组织安排1、施工工期:

6、根据施工总体进度计划安排,确保不影响工期,本标段横隔梁和湿接缝工程计划安排在2011年10月10日~2011年11月15日。2、施工部署:横隔梁和湿接缝工程由项目经理刘继先总体负责,谢尧为施工负责人,现场由崔洪彬负责,总工张卫强进行技术把关,工程质量检测为李杰等,实验室主任刘秀娟(附图1分项施工组织机构图)。3、人、料、机投入计划(1)主要人员安排计划技术负责1人现场负责1人测量员3人技术员2人施工班长2人混凝土工6人材料员2人安全员2人钢筋工8人普通工人10人起重工2人电焊工4人木工4人预应力张拉工4人(2)施工机械配备计划现场配备机械设备表名称型号数量备注发电机2001台良好吊车25

7、C2台良好电焊机306台良好钢筋加工设备1套良好振捣器503台良好搅拌机1台良好灰浆泵31台良好250穿心型千斤顶2台良好尼康全站仪352C1台良好索佳水准仪C32Ⅱ2台良好(3)主要材料要求1)预应力钢筋采用高强度低松弛钢绞线φs15.2,其技术性能应符合(5224-2003)标准.其力学性能如下1860,1.95x105,整根钢绞线公称截面积为139mm2。2)混凝土标号:预制箱梁跨中横梁和湿接缝采用C50,现浇接头段采用C50

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。