轻型井点深井降水方案

轻型井点深井降水方案

ID:11317992

大小:58.45 KB

页数:15页

时间:2018-07-11

上传者:直挂云帆济沧海
轻型井点深井降水方案_第1页
轻型井点深井降水方案_第2页
轻型井点深井降水方案_第3页
轻型井点深井降水方案_第4页
轻型井点深井降水方案_第5页
资源描述:

《轻型井点深井降水方案》由会员上传分享,免费在线阅读,更多相关内容在行业资料-天天文库

启东市安置房城东村高层住宅小区轻型井点、深井降水施工方案江苏南通二建集团有限公司2012年4月25日15 目录一、工程概况 ···································································3二、编制依据 ····································································3三、降水方案选择及排水方案 ···············································41.轻型井点····································································42.深井降水····································································63.排水方案····································································9四、井点、深井降水施工机构及管理人员···························9五、降水时对周边边坡的影响和监测方法··························9六、质量保证措施 ·······························································10七、安全施工措施      ················································11八、危险点分析  ································································13九、安全生产及文明施工措施  ··············································14十、环保措施   ································································15附:现场排水布置图15 城东村安置房高层小区B标段井点、深井降水方案一、工程概况工程名称:城东村安置房小区B标段工程地址:城东村安置房小区A、B标段位于南苑路南侧,惠阳路东侧,纬一路北侧,秀水路西侧。建筑面积约292000平方米。A、B标段中间由原有河道分隔而成。B标段在A标段南侧(纬一路边侧)。建设单位:启东市新城建设发展有限公司围护设计单位:启东市建筑设计院有限公司勘察单位:江苏省地质勘察院监理单位:南通瑞达监理有限公司施工单位:江苏南通二建集团有限公司建筑物简况:B标段主要由11幢高层单体和一个地下车库及一些配套啇住辅助用房等,建筑面积约153000平方米。本工程基坑周长约1300m,基坑形状不规则。工程地质情况:根据地质报告基坑土体为由1~4层土层构成,第1层素填土,第2层为粉质粘土夹粉土第3层为粉土夹粉质粘土,第4层为粉土夹粉砂。二、编制依据(1)施工蓝图(2)《启东市安置房城东村高层小区基坑支护工程施工图》;(3)《启东市安置房城东村高层住宅小区工程勘察报告》(4)《建筑工程施工质量验收统一标准》(GB50300-2001);(5)《施工现场临时用电安全技术规范》(JGJ46-2005);(6)我公司对施工现场进行踏勘了解的有关情况;15 (7)江苏省及我公司有关安全、文明施工的文件规定。三、降水方案选择及排水方案根据启东市建筑设计院有限公司设计的《启东市安置房城东村高层小区基坑支护工程施工图》;基坑降水采用放坡段坑周侧设置一列轻型井点,坑内降水主要采用深井降水。局部有降水困难的地方在施工过程中考虑增设井点。 1、轻型井点轻型井点工作原理:井点降水是利用真空吸力,把地下水位降低,轻型井点主要部件是喷射点内管底端的排水装置,经过总管与主管之间和环形空间直达底端,在喷咀处由于水面的缩小,使工程水流具有极度高的流速,在喷咀附近造成负压,因而将地下水经滤管吸入,吸入的地下水在泵体内混合,然后再把水排出,周而复始,循环工作。施工工艺:井点降水采用水枪冲孔工艺为:定位→开沟→放支管→填砂→安装总管及设备→调试抽水→正式抽水→拆除1、定位根据现场情况和设计图,确定井点布置方位为放坡段周侧外2.5米位置基坑周边一圈。2、开沟、坑:在轻型井点外侧适宜位置开沟、坑,为排放冲孔用循环水(若表面是杂填土,必须清除至原土)。3、冲孔采用3BL-9导杆式水冲松成孔,孔径约0.25-0.30m,孔深超过支管(连滤头)长度0.5m。15 4、放支管:成孔后迅速放支管,放入后以管口出水为合格。本工程井点管采用直径48mm的钢管,长度为4.8m,管下端配有与井点管同径的滤管和管尖。滤管长度为1.2m,滤管壁上钻有呈梅花状的直径为φ12的滤孔。滤孔面积一般为滤管表面积的15%-20%,滤管壁处包两层滤网内层采用网眼为30-50孔/cm2的尼龙丝布细滤网,外层采用网眼为3-10孔/cm2的尼龙丝布粗滤网,井点管的上端用弯管与总管相连。5、填砂:安设支管后及时填砂,以粒径为1.2mm至1.5mm粗砂为宜,每孔充填砂约350Kg。6、安装总管及设备:A、支管和总管用弹簧橡胶软管连接,两端用12#铁丝扎紧后,再用保鲜膜包4-5层,以防漏气。B、总管和机组连接,机组安设位置以放在总管中部为宜,若考虑排水位置或场地具体情况,亦可放在端处,具体以本现场实际情况定。7、调试抽水8、正式抽水9、拆除:降水达到要求后,即可进行土方开挖,为降低费用,可采取进场挖机勾住井点管套,直接拔取。施工设计及机具的选择配置(一)施工设计1、基坑开挖深度:2.2m~4.65m(自然地面下)2、支管抽水影响半径:6m3、支管间距:0.9m15 抽水时间:120天(基坑开挖前15天到±0.00回填土结束并满足建筑物抗浮要求为止)。(一)机具的选择配置沿基坑周侧设置轻型井点周长1290米,按45米设置一套共需设置29套。降水设备采用JSJ-690真空泵机,离心泵功率7.5kw,最大抽水量为60m3/h,最大抽吸深度为9.6m,最大提升高度为8m,真空压力必须达到6-8Kg,3BL-9导杆水冲枪四套,井点总管直径为Φ100每节6m,井点管直径为Φ48每根4.8米(插深4.5米)。、施工方案本工程基坑开挖深度为自然地面下2.2m~4.65m,抽水设备负荷45米一套,井点支管间距0.9米,支管长度为4.8米(含0.8米滤头),井点降水设备及排水布置详见附图,各套井点管抽出的水均由软管接至邻近沉淀池排出。本段井点设备及管线安装时间约为四天,土方开挖前预抽水时间约为15天。2.深井降水深井降水方案:基坑采用¢400管井降水,共设249口,其中主楼部份井深9.0米,共94口,地下汽车库部分井深13.0米,共155口。管井为无砂混凝土管。深井降水打井及安装时间10天。降水时间考试为120天。15 、工艺流程准备工作钻机进场定位安装开孔下护口管钻进终孔后冲孔换浆下井管稀释泥浆填砂止水封孔洗井下泵试抽合理安排排水管路及电缆电路试验正式抽水记录。设备选型本工程降水井孔径最大为φ800mm,根据本公司多年的施工经验,本工程钻井设备选用GPS—10型钻机,成孔采用正循环自然泥浆造浆,泥浆护壁回转达钻进成孔,钻头选用带保径圈的三翼钻头,钻头直径按设计及规范要求。根据施工经验,使用这些钻头施工稳定性好,能确保成孔质量,能胡效控制成孔中的缩径现象,为确保工程质量奠定基础。、施工技术要求(1)准备工作支撑梁开始后,即开始施工部署,首先组建项目经理部,落实材料和人员,合理安排人财物,与甲方及工地上各相关单位保持密切协作。(2)材料到位专人负责过料,工程师核定,确保井壁管、过滤管、填料、粘土等到材料的质量。材料不到位,质量不符合要求不能开钻。(3)进出场院、定位、埋设护孔管由甲方提供“三通一平”,钻机进场。钻井井位确定后应由总包方(土建方)认可(井位需微调距梁、柱近距不得小于1.5米),基础牢固,应放在硬粘土或碎石道渣上。钻机安放稳固、水平、护孔管中心、磨盘中心、大钩应成一垂直线。埋设护孔管要求垂直,并打入原状土中10—15 20cm,外围用粘土填实夯实,井管、砂料到位后才能开钻,钻孔孔斜不超过1%,要求整个钻孔孔壁圆整光滑,钻进时不允许采用有弯曲的钻杆。(4)钻进清孔钻进中保持泥浆比重在1.1—1.15,尽量采用地层自然造浆,整个钻进过程中要求大钩吊紧后徐徐给进(始终处于减压钻进),避免钻具产生一次弯曲。特别是开孔时不能让机上钻杆和水接头产生大幅摆动。每钻进一根钻杆应重复扫孔一次,并清理孔内泥块后再接新钻杆,终孔后应彻底清孔,直到返回泥浆内不含泥块,返出的泥浆含砂量<12%后提钻。(5)下井管按设计井深事先将井管排列、组合,下管时所有深井的底部按标高严格控制,并且保持井口标高一致。井管应平稳入孔,每节井管的两端口要找平,确保连接垂直,完整无隙,外包竹片双层滤布铁丝固定捆绑,以免脱落。为了保证井管不靠在井壁上和保证填料厚度,在滤水管上下部各加一组扶正器,保证环状填料间隙厚度不大于180mm,过滤器应刷洗干净,过滤器缝隙均匀,外包一层40目滤网。下管要准备到位。自然落下,稍转动落到位,不可强力压下,以免损坏过滤结构。井管到位后下钻杆泥浆稀释到1.05左右,在稀释泥浆时井管管口应密封,使泥浆从过滤器经井管与孔壁的环状间返回地面,稀释泥浆应逐步缓慢进行。井管上口高度高出地面0.5米。(6)填料15 稀释泥浆比重在1.05~1.08后关小泵量,将填料(疏干井的填料为建筑砂和瓜子片的混合物,承压井的填料为砾砂)徐徐填入,并随填随测填砂顶面的高度,不得超高。设计钻孔直径800mm,井管直径、填料厚度、填砂高度严格按设计图纸进行。(7)止水填料层上部2m左右用粘土填实。(8)联合洗井用空压机洗井并清除井底存砂。(9)下泵抽水井施工结束后,用泵进行抽水并对井验收评定。3排水方案在基坑开挖前在场地临时主干道四周边侧辅设一圈DN500玻纹管每隔50米砌一座沉淀池,东、西、侧排水均向北侧排放由北侧沉淀池连接的DN500玻纹管排到北侧河中。南侧排水通过围墙外预埋的东、西方向的DN600玻纹管(每隔25m设内径1000×1000的检查井)由东向西排到西侧大河中。基坑边井点降水、深井降水排水管就近接入DN500玻纹管中。负责人:四、井点、深井降水施工机构及管理人员操作员安全员监测员施工员技术负责人15 五、降水时对周边边坡的影响和监测方法、降水对周边建筑物影响的分析:由于本工程设在市郊安置小区,距周边建筑物、道路过远,大面积开挖基坑,基本上对周边建筑物和周边道路不会产生影响,本工程基坑降水采用井点和深井降水基坑开挖后,为确保施工安全,在施工期间,应对外围基坑边坡采取如下监测方法:、监测方法:施工期间主要对场外水位变化、周边的外围基坑边坡变形进行观测,井点降水进行前观测的数据作为起始数据,随着基坑水位下降,以起始数据为基础,进行水位、周边的建筑物垂直度和沉降观测,做好记录。方法如下:(1)对坑外水位变化的监测:采取对设置的观测井,直接用竹杆测试。(2)、对周围外围基坑边坡变形的观测:垂直变形观测:采取经纬仪,开工后,在现场设置1~2个点为基准点,从不同方向观测周边建筑物的一外墙边线顶点与工地外一高层建筑(参照物)一外墙边线顶点之间的角度,记录数据,观测每天记录的数据是否有变化,根据变化计算周边外围基坑边坡发生的变形。沉降观测:采用水准仪,根据施工前设定在周边建筑物的水平观测点(观测点可以以周边建筑物的一水平线条为准,也可设红漆标志),每天观测其水平方向位移变化。15 (3)、监测资料每日以报表形式提交一份,观测时间自降水开始至结束,同时将该阶段观测数据移交下一工种,继续执行。六质量保证措施、坐标及高程控制点经过设置的基准点引测,检查验收合格后进行土方开挖、降水施工。、土方开挖前用石灰划出开挖线,确保土方开挖尺寸正确。基坑开挖尺寸及标高符合质量标准。、为了保证达到有效降水,机械型号、功率须达到方案要求。并现场配有备用泵。、在施工区域设有降水观察孔,掌握了解降水情况,保证降水效果。、井点降水设备正常工作后,应设置专人24小时不间隔值班,以防出现异常应及时修复。、在临近本工程的建筑物上设置沉降观测点;开始降水时,应缓慢进行,防止降水速度过快,影响原主厂房地基发生不均匀沉降;随时观察原主厂房沉降情况,控制降水速度。七、安全施工措施、施工作业(1)现场钻机必须持证操作,挂牌负责,定机定人;(2)保持机械设备整齐完好,无老油污,绳索无锈浊,磨损控制在标准范围内,齿轮及齿轮啮全处润滑良好;(3)钻机转动部分一定要有安全防护装置,开钻前要检查齿轮箱和其他机械传动部分是否灵敏、安全、可靠,启动时要看清机械周围环境,要先招呼后推闸;15 (4)职工禁止不戴安全帽、穿拖鞋、赤膊进入施工现场,二米以上高空作业必须佩戴安全带;(5)施工现场的沟、坑等处必须有防护装置或明显标志,护孔管理好后必须加盖或设置警戒线,泥浆池要设置防护栏杆;(6)施工前必须先摸清有关地下构筑物及地下电源、水、煤气管道的情况,及时按国家有关规定采取防护措施;(7)在架空输电线附近施工,必须严格按安全操作规程的有关规定进行施工,高压线的正下方不得堆放吊车等设备,钻架与高压线之间应有可靠的安全距离;(8)夜间施工要有足够的照明设备,钻机操作台、传动及转盘等危险部位,主要通道不能留有黑影;(9)钻机机长、班长兼安全员,钻机移动必须亲临机台指挥,每天上下班时对劳动用品、机械设备及机具、吊具、索具等进行检查,确保用具在完好的情况下进行施工,清除隐患,确保安全施工。 (10)深井井口为保证安全,井口须用木板和方料制成井盖。、安全用电(1)施工现场不得架设裸导线,严禁乱拉乱接,不准直接绑扎在金属支架上;(2)所有电气设备的金属外壳必须有良好的接地或接零保护;(3)所有的临时和移动电器必须设置有效的漏电保护开关;(4)电力线路和设备的选型必须按国家标准限定安全载流量;(5)15 在十分潮湿的场所或金属构架等导电性能良好的作业场所,宜使用安全电压;(6)现场应有醒目的电气安全标志,无有效安全技术措施的电气设备不得使用;(7)配电箱内开关、熔断器、插座等设备齐全完好,配线及设备排列整齐,压接牢固,操作面无带电体外露,电箱外壳设接地保护,每个回路设漏电开关,动力和照明分开控制,并单独设置单相三眼不等距安全插座,上设漏电开关;(8)施工现场的分电箱必须架空设置,其询问距地高度不少于0.5m;(9)电焊机的外壳应完好,其一、二次侧的接线柱应有防护罩保护,其一次侧源应有橡套电缆线,长度不得超过5m;(10)现场照明一律采用软质像皮护套线并有漏电开关保护,移动式碘钨灯的金属支架应有可靠的接地(接零)和漏电开关保护,灯具距地不小低于2.5m.、工地防火(1)施工现场建立安全防火班子,安全动为制度;(2)对进场的职工进行消防知识教育;(3)现场划分用作业区、易燃易爆区、生活区,接规定保持防火距离;(4)现场设消防灭火器具,按规定对重点部位,主要部位备齐灭火器具的数量,并经常维修保养,对消防器具有专人管理;(5)发现火警及时向有关部门报告,并立即救护措施。八、危险点分析15 电源线老化漏电伤人。预防措施:根据水泵电机电流量配置相应电源线,做到一闸一机,漏电保护器动作灵活,交接班时对漏电保护器进行试动作,防止因长时间运行而失灵。塌方预防措施:土方施工按要求坡度放坡,设置专人巡视边坡的稳定性,防止土方坍塌事故发生。机械伤害预防措施:由于同挖土工程交叉施工,严禁在机械挖土范围内进行人工降水施工,防止机械伤害。高处坠落预防措施:在基坑四周设置红白相间警示栏杆,栏杆距基坑不小于1m。防止车辆、人员坠入坑内。九、安全生产及文明施工措施、进入施工现场的作业人员,必须正确佩戴安全帽及穿戴好劳动防护用品。、如有交叉作业应设专人监护或有防护措施,否则严禁施工,以免发生物体打击及碰撞事故。、如在夜间施工安全照明必须充足。、文明施工责任区划分明确,无死角,责任落实,并设有明显标记,便于检查、监督。、施工用机械、设备完好、清洁,安全操作规程齐全,操作人员持证上岗,并熟悉机械性能和工作条件。15 、施工现场在施工过程中出现的各种坑、沟、孔洞,施工单位应根据实际情况,设置标准的与地平行的安全沟道盖板或可靠的围栏、档脚板或警告标志。、拉电源时,严禁将电线直接勾挂在闸刀上或直接插入插座内使用,必须用插头连接。、施工单位应经常组织施工人员进行安全文明施工学习,使每位施工人员掌握安全文明施工知识,不断地提高安全文明施工意识,做到安全生产文明施工。、由于井点、深井降水处于湿工作状态下,电源安全装置须达到三级保护要求。十、环保措施、井点施工产生的泥浆、弃土应及时清运,运输时必须覆盖,避免产生扬尘和遗撒。、排出的地下水应经过沉淀处理后方可排入专用管道。、施工现场应遵守现行国家标准《建筑施工场界噪声限值》GB12523规定的噪声限值,发现超标应及时采取措施纠正。15

当前文档最多预览五页,下载文档查看全文

此文档下载收益归作者所有

当前文档最多预览五页,下载文档查看全文
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,天天文库负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
关闭